It’s been a long… long… haul. As an engineer, I’ve done some napkin math problems in my day, but this one has been a doozy. By my guess, Team Monkey Fist has put somewhere on the order of 700 primate-hours into refurbishing Wildfire and getting her ready for the wilds of the Inside Passage. We’ve Read More…
Category: Repairs
Three years with this mistress
You know how your Facebook and the photo app on your phone pop up flashbacks? An out of context picture with a caption along the lines of ‘Here’s what you were doing XX years ago!’? This week, I pulled out my phone and noticed the photo app lined up four boxes: Three years ago, Two Read More…
Getting organized below
So if you have ever had a small boat with a cabin, you know how the cabin quickly becomes a dumping ground. Stuff ends up in piles, pushed around while you’re trying to find things. adding shelving or compartments detracts from the versatility of the space, and stuff all over makes finding things hard and Read More…
Setting the Spinnaker
So, about a month or so ago I managed to get some more done on the Lady Jane. If you remember, when I got it on the water for the last Wooden Boat Festival, it was sailable, but still needed some bits resolved. Sailing the boat was a two handed ordeal as I had no Read More…
Getting to know the Lady Jane.
So, She’s been in the water a month now, tied up out at Shillshole. In that month, I’ve been getting to know her. She’s been all the way to Port Townsend for the PT wooden boat festival, and thru the locks for the last Duck dodge, and again thru the locks for the festival at Read More…
Ropework!
Well, Today I made some steps towards finishing the running rigging. I had to do some interesting bits of rope work I thought I’d share. I had to make up the jib cars, their adjustment lines, and the tricky, double reverse tapered jib line. Fortunately, I remembered to take lots of pictures, so I can walk Read More…
Mast is stepped
So I managed to sell my 1965 Vespa 90; selling it got me the cash for some big-ticket items I had been needing. I’m happy to say that I now have all the ports installed. I also picked up this big box of custom rigging from Fisheries Supply. It’s a full set of standing rigging Read More…
Centerboard winch done
We’ve had rain for the past week or so here in Seattle, so I took advantage of the now enclosed cabin and installed the centerboard winch. These old Lightnings use an interesting setup to gain the mechanical advantage needed to lift the honkin big swing centerboard keel. It’s a winch, but not your typical sailboat Read More…
It’s the little things
It’s getting to that point where all I seem to be doing is little things, but these little things look huge as far as progress towards finishing. Last year, I’d spend two weeks doing carpentry and the boat would still look roughly the same; now I spend an afternoon on little things and it just Read More…
Rubrail installation – with one person!
So, today I installed the Ipe rubrail down both sides of the boat. I had been hesitant to tackle this solo, as the thought of wrangling a 20 foot rubrail into position by myself self gave me pause. But, after looking at the problem from many angles, I came up with a solution. First, i Read More…
PAINT!
Well, With the exception of the rudder, the paint is done. Huge step forward, as it now looks like I’ve actually accomplished something. I started out with Petit EZ-poxy one part polyurethane. I decided to use their ‘Performance enhancer’; basically it’s an isocyanate catalyst that is supposed to improve gloss and durability. You add a Read More…
Straightening my bent tiller, and making the rub rail
A few weeks back I had started on my tiller/rudder combination, and after sanding and cleaning up the tiller I had chosen to use, I realized it was bent. I immediately thought that just putting it in a steam box would straighten it up, as it looked like this was storage damage adn that it Read More…
Chugging right along!
I’ve been steadily chugging forward, and making significant headway. I got the boat in primer. Of course, once I sanded it it quickly became apparent how much fairing I had missed. So, I decided that I was going to have to skim coat the hull sides with fairing compound, sand it, and re-apply the hi-build Read More…
Bowsprit, varnish, mast repairs, and a bent tiller.
The Bowsprit mounting is progressing; the back up under the foredeck is about half done. I just need to add a little more plywood so that the forward mount is tied into the side of the boat, the deck, and the deck beam and the backup for the stem fitting. once that is done, it should Read More…
Moved in to new digs!
Whew. We’ve moved and finally have internet on our new liveaboard so I can finally post an update. The Lady Jane now has taken up residence in the yard at the Northlake workshop of the Center for Wooden Boats. I’m truly happy for their support and for them accommodating me and making it possible to Read More…
Rush to get it ready for weather.
So, in three weeks, we move on to the Monsoon as liveaboards, and I won’t have a garage to work in. Right now, it looks like I’ll be finishing up the Lady Jane at the Center for Wooden Boats‘ northlake shop. Unfortunatly, I’ll be working on it outdoors, so i’m in a race against the Read More…
It’s been a while. I’ve been busy.
When we last left off, I had just gotten the Lady Jane back into the garage after getting the bottom done right on the tail end of the last of the good weather we had for outdoor work here in the Pacific Northwest. I haven’t been doing many updates, but not due to lack of Read More…
The bottom is done!
there’s been not alot of posting, but alot of progress nonetheless So to recap: I did a solvent wipe of the entire bottom with brushing thinner. I decided to go with pettit ‘Black Widow’. This is a Hard bottom paint, a non ablative. it’s loaded with stuff to make it polishable and slippery. And spiders, Read More…
Bottom refastened and plank replaced
So, this picture doesn’t look much different than the last one I posted. The difference is that I’ve refastened the bottom. Something like 350 brass screws pulled, the holes drilled larger, and the screws replaced with slightly larger and longer silicon bronze screws. this was complicated by the fact that each screw head had been Read More…
Benches trimmed, rigging measured, and boat overhauled
Tons of progress. First, I hauled out the benches for the boat. Originally, the Lady Jane had a set of full wraparound mahogany benches. I wanted to reuse them for the now much smaller cockpit, but I needed to trim them down, and open up the back to make space for the hatch I added Read More…
Cabin structure is done, hatch design started.
I’ve done it. the cabin structure is together. All the panels are together, and the hatch brace has been removed. The edges are filleted and sanded. I’m really happy with the progress. I’ve also started work on the hatch. I had to get creative, as I do not have alot of space on top of Read More…
Advanced Boatbuilding Geometry: Triangulating a conic section.
So over the course of yesterday and today I laid out and cut the front panel for the cabin on the Lady Jane. This was a tricky bit of work, as it was set at an angle, intersecting a curve on the top and bottom of the piece and the two triangles at the side. Read More…
The cabin goes 3-D!
Ton of progress this week. To start things off, I ended up having to replace two more ribs. thought I had been done with that, but the more I moved about in the boat the more it became apparent two more of the midships ribs were not up to snuff. So a step back, but Read More…
Mast step and forward centerboard trunk support done!
Today went well. 11 pieces got installed! The mast step and centerboard trunk to deck tie-in is all done, and everything under the foredeck is done. I just need to fit the winch to lift the board. In that shot you can see that my scope of work expanded, again. you see, there was an Read More…
Watertight bulkheads installed!
The hits keep on coming! big progress today on the 4th of July. It was a four pieces of wood day. Two big, and two small. The two small pieces were the backups for the traveler/bridle. I also spaced these so that if I later wanted to install an autopilot I’ll already have the backup Read More…
Sculling post, deck seam, and other bits installed.
Progress is happening. lately, I’ve been measuring progress by how many pieces of wood I manage to get installed in a day. I’ve had a few solid five piece days, so I’m feeling pretty good about it. Since I last wrote, I managed to get all of the pieces put in that the new fore Read More…
Stemhead fitting found!
I’ve been looking for a replacement stemhead fitting for the Lady Jane. As it came to me, the boat had a loosely held on amalgum of hardware hanging out of a hole in the deck. It was comprozed of a worn bronze bow loop, two bent up and modified stainless steel tangs, and a brass Read More…
SEVENTY48, R2AK Ruckus, and a re-evaulating of priorities.
I spent a good chunk of last week among kindred spirits, spending significant time volunteering to help make the first SEVENTY48 a resounding success. The SEVENTY48 is the offshoot of the R2AK; a human-power-only grind of a race from Tacoma to Port Townsend. It was a remarkable experience, and i spent something like 30 hours Read More…
Mast step fabrication and final rib replacement
So, I’m in better spirits after making much progress on the Lady Jane.
Setbacks.
Well, last weekend I had a few setbacks on the progress on getting the Lady Jane done. I began the day by trying to finish off removing misc hardware and scraping the interior paint. Previously i had limited my paint removal efforts to the bottom of the boat and the areas i nmeeded to to Read More…
Ribs are done and I’m beginning to design the cabin.
Today, I finished the rib replacement. a total of six half-ribs have been replaced. The aft, full width rib I had hoped to get in as one piece, but I ended up doing it as two halves. The ‘how to build a lightning’ book from the international class association said that doing it in one Read More…
Replacing Ribs, part one.
Now that the paint has been removed from the bottom, I’m tackling the most pressing repairs; the boat needs four ribs replaced. I want to get this taken care of first, so the hull is back to where it needs to be, structurally. I’ve discovered that this boat was fastened with brass hardware, and that Read More…
Paint removal, and Taking up.
The paint on the Lady Jane was in rough shape. Here’s a shot. Coming off in flakes, and generally just a mess. I have made significant progress. I had been scraping the paint, but a few weeks ago, i noticed something else. See, wooden boats of this style of construction (carvel planked) are sensitive to Read More…
Into the shop with the Lady Jane.
It’s been a while since an update, but I have been working on making progress on the Lady Jane I had to close my scooter shop and reconfigure the garage to get the hull in there. It was quite the ordeal, but I managed to get this done the middle of January. The next step Read More…
Last minute shakeups, but I set sail today!
Whew! Well plan is I set sail in the next two hours. I decided , at the last minute, to make drastic changes. i have never been 100% happy with my mainsail; it’s so heavy a material that it really only develops shape and works well in 15-20+ winds. After sailing in the Sloop Tavern Read More…
Electronics, winches, and Boom tents, OH MY!
Prep continues here at Team Hodge. The Sperry flag from 2016 will be returning, reincarnated as a boom tent. This really has been George’s project; since he ends up staying at the boat alot at events like this he wanted some shade. We just need to add some grommets and some straps to hold it Read More…
Countdown to 2017 R2AK
Shesh. after a layoff at work taking a big bite out of my R2AK budget, I’m finally back to getting prepped for R2AK. Sadly, i had to curtail some of my bigger ticket modifications. I’ll still have oars, and not a new Hobie Drive. I’ll also still have the same set of tarps for sails. Read More…
Preparing for 2017
Well, I’m in it again- I’ll be doing the first leg again in 2017. I’ve begun re-evaluating what worked and didn’t last year. The oars have got to go. While I previously have carried oars on the Minnow, it does not row well. With the flat bottom, it does not track well without input from Read More…
Almost ready to go
Yesh. Two weeks left till i leave. And… I think I’ll be ready. I’ve been a bit of a slacker on posting updates lately, as i’ve been so busy. but progress has been made. I have my new Ocean Rodeo Ignite drysuit. This thing is great. Decided to take a shot with the boat on Read More…
Electrical system is done!
So, today and yesterday we got a double dose of good weather here in Seattle. I managed to make some significant progress I managed to get two costs of paint on the coamings and the areas that needed touching up, I got the Andersen bailer installed, and the electrical system completed.
Hatch coamings are in!
Today, I managed to get up to Sea-Mar before they closed and get some hardener. From Harbor island to Fisherman’s terminal in 25 minutes! Once I got home, I got to work in the back yard, moving along with the hatch replacement. I’m happy to say the coaming install went well.
Slowly making progress… and I have a new sponsor!
Work is progressing, slowly.
And the refit begins….
So this Friday I finally started the first round of upgrades and improvements to the boat. I pulled it out from under the tarp, stepped back, and took a deep breath.
The long to-do list
So, here’s a start of a run down on what i’ll need to do to get ready to go.